ScheduleChat
AI project scheduling

Ask your project schedule anything.

ScheduleChat pairs a real critical-path engine with a chat assistant. Every date, float value and forecast is computed — so you get answers you can defend in a progress meeting, not numbers a chatbot made up.

Built for the person who owns the schedule

Not a chatbot bolted onto a Gantt chart. A scheduling engine you can talk to.

Critical path, computed

Ask what's driving the finish and get the real zero-float chain from a CPM engine — in order, with the current driver named. Never a number the model invented.

Talk to your schedule

Plain-language questions about dates, float and what-if scenarios. The assistant picks the right tool, runs the numbers, and answers with a card you can cite.

Baselines & variance

Freeze the plan, record what actually happened, and see slippage in working days — positive always means late, so a delay never reads as good news.

Target-date recovery

Name the finish you need. Get concrete, costed options: which tasks to shorten, which links to overlap, and by exactly how much — verified against the engine.

Import & export

Bring in Primavera P6 XER, Microsoft Project XML, or .mpp files from Project 2010 and later. Export to Excel, CSV, a printable PDF report, XER, or MS Project XML.

One project, one database

Every project is an isolated schedule. Reads and writes scope to the active project automatically — no cross-project leakage, ever.

From file to forecast in three steps

01

Import your programme

Drop in a P6 XER, MS Project XML or .mpp file, or build the schedule from a conversation. The CPM engine computes dates, float and the critical path on the spot.

02

Ask in plain language

"When does this finish?" "What's driving it?" "What if inspection slips a week?" Every answer comes from the engine and arrives as a structured card.

03

Record reality, track the slip

Mark tasks complete with their actual dates. Baselines stay frozen, variance is measured in working days, and the Gantt shows what happened against the plan.

Live demo

See it answer like a scheduler would

Tap a question about the sample Riverside Tower project. Every answer is computed by the critical-path engine — no guessing.

Riverside Tower — project chat

👋 This is the Riverside Tower sample schedule — 41 activities across 18 months. Tap a question below to see a computed answer.

Schedule Finish 14 Mar 2027
Site setup & mobilisation
Foundations pour
Core structure L1–L8
Facade install
MEP rough-in
Fit-out & commissioning
Critical path Has float

Start free.

Jump in and start building — no card, no setup.

Free
$0
  • Talk to your schedule in plain language
  • Real critical-path engine — computed, not guessed
  • Baselines, variance & what-if analysis
  • Import Primavera P6 & MS Project
Join the waitlist

Free during early access. No card required.

Questions schedulers ask first

Does the AI make up dates?

No. Dates, float and the critical path come from a critical-path (CPM) engine that runs on your actual activities and logic. The assistant decides which calculation to run and explains the result, but the numbers themselves are computed.

Which schedule files can I import?

Primavera P6 XER files, Microsoft Project XML, and Microsoft Project .mpp files from Project 2010 and later. If an .mpp file can't be read, ScheduleChat tells you how to save it as XML from Microsoft Project instead.

Do I need Primavera P6 or Microsoft Project installed?

No. ScheduleChat imports the file itself, so you can open and question a schedule someone sent you without a P6 or Microsoft Project licence.

Can I get my schedule back out?

Yes. Export to Excel, CSV, a printable PDF report, P6 XER or MS Project XML, so the schedule can go back into the tool your team uses as the system of record.

What does it cost?

You can start free with no card. The free plan has limits on projects, schedule size, daily messages and some import/export formats; the Pro plan lifts them.

Are my projects kept separate?

Yes. Each project is its own isolated schedule, and the assistant only reads and writes the project you have open.

More on CPM, float and schedule files in the ScheduleChat blog.

Stop guessing your finish date.

ScheduleChat is opening to planners in small batches. Join the waitlist and we'll email you when your spot is ready.