For the people who live with the schedule
The problems schedulers, project managers and site teams run into every week with P6, MS Project and spreadsheets, and practical ways around them.
-
How to Open an XER File Without Primavera P6
No P6 seat, no problem — as long as you know which tables hold the activities, which hold the logic, and what never gets recalculated.
3 min read -
Total Float vs Free Float: The Difference That Causes the Arguments
Quote the wrong float in a progress meeting and you either promise slack you don't have or start an argument you didn't need.
3 min read -
Your Schedule Has 299 Broken Links. Your Software Never Told You.
The finish date looked fine. The network underneath it had 299 open ends, 649 redundant links and 9 leads — counted by nobody, until an engine did.
3 min read -
Primavera P6 Was Built for Another Century
The schedule is the last major project document still locked inside a specialist's desktop application. The centre of gravity has already moved.
3 min read -
5 Answers Your AI Chatbot Got Wrong About Your Own Schedule
A critical path that changes between asks, float without a calendar, answers that soften under pushback. Five tests, each under a minute.
3 min read -
I Asked ChatGPT to Run My Critical Path. It Invented One.
The count changes between asks, it agrees with your pushback, and it claims actions it never took. How to prove it on your own file in five minutes.
3 min read -
The MS Project Setting That's Been Lying to You About Your Critical Path
With single-path float, the work gating every line looked comfortable. On the file's own basis it was critical at zero float from the first week.
3 min read -
Why nobody on site can read your P6 schedule (and what to send instead)
The superintendent's question is in the file somewhere. Here's how to get it to him before Thursday's meeting.
6 min read -
Your finish date slipped three weeks. Can anyone explain why?
Split the slip into time, performance, edits and settings, and turn 'the facade was late' into a table of working days.
6 min read -
Paying for a P6 licence just to look at a schedule
Authors, reviewers and consumers need different things from a schedule. Licensing everyone as an author is where the money goes.
5 min read -
Your Excel Gantt chart is lying to you
Joinery is two weeks late, the bar moves, and handover stays green. Why spreadsheet programmes can't warn you, and what to do about it.
5 min read -
Best XER file viewers in 2026 (free and paid, compared)
Display or recalculate, trace logic, quality checks, platform and price: seven ways to open an XER, ranked by the job they do.
7 min read -
Best AI tools for construction scheduling in 2026
Question-answering, generative optimisation, risk forecasting or a help assistant? What each 'AI scheduling' tool actually does with your file.
7 min read