How to Open an XER File Without Primavera P6
Someone sends you a schedule and it arrives as a single file ending in .xer. You don't have Primavera P6 installed — or you do, but not on this machine, not with a spare licence, not today. The programme manager wants answers this afternoon. What can you actually do with an XER file?
More than you might think — if you know what the file is.
What an XER file actually is
An XER is P6's export format: a plain-text file, tab-delimited, holding the whole project as a stack of tables. Open one in a text editor and you'll see sections starting with %T — PROJECT, TASK (the activities), TASKPRED (the logic links), CALENDAR, RSRC and dozens more — each followed by field names (%F) and rows of data (%R).
That structure is good news. The file is not a black box; it's a small database in text form. Every tool below is just a different way of reading those tables.
Option 1: Read it raw in Excel (quick look only)
Rename a copy of the file to .txt and open it in Excel with tab as the delimiter. Find the TASK block and you can read activity names, durations and dates as text.
Be honest about the limits: dates are stored as text, the logic lives in a different table (TASKPRED, keyed by IDs you'd have to resolve by hand), and there is no calculation — nothing recomputes float or the critical path. Fine for "what's the activity called?" Useless for "what's driving the finish date?" And never save from Excel back over the file; work on a copy.
Option 2: Import it into another scheduling tool
MS Project cannot open an XER natively. The routes are conversion (XER to MPP or MPX through a converter) or a tool that imports XER directly. Conversion quality varies — calendars, constraints and relationship types are the fields most often mangled in translation, so whatever you convert, spot-check the activity count, the finish date and a few float values against the sender's PDF before you trust it.
Option 3: A viewer
Viewer tools exist precisely for this gap — the licence-to-look problem. They open the XER read-only and show the Gantt, the logic and the dates without a P6 seat. Good for a meeting, limited for analysis: most viewers show you the schedule as exported, including whatever float basis and options the sender's P6 was set to. We compared the main ones in our XER viewer roundup.
Option 4: Ask it questions
The reason the file lands on your desk is rarely "display the Gantt". It's a question: what's critical, what's overdue, what slips if this delivery moves. That's the gap ScheduleChat fills — upload the XER, and the schedule is parsed into a real network (activities, logic, calendars), the CPM is computed by an engine, and you ask in plain language. The counts are the file's counts, the float is on the file's own basis, and the answers are the same for everyone who asks — not a per-viewer rendering.
Whichever route you take, run the same sanity check before you quote a single number from an XER you didn't create: activity count, project finish date, and one float value you can verify by hand. XER files carry the sender's settings with them, and two honest tools can show two different critical paths from one file if the settings differ. The file is data. Treat it that way, and it will tell you the truth.