Best XER file viewers in 2026 (free and paid, compared)

By the ScheduleChat team · · 7 min read

A claims consultant gets a contractor's baseline and four monthly updates as .xer files on a Friday afternoon. An owner's rep is sent a tender programme to review by Tuesday. A site manager gets a "Rev 9" XER and a request to "check your sections". None of them has Primavera P6.

An XER is P6's export format: a set of database tables in tab-separated text. You can open it in a text editor, but you can't really read a schedule that way. You need a tool that turns it back into activities, logic and dates.

There are now more tools for this than ever, and they do quite different jobs. This guide ranks the ones we think are worth knowing in 2026, and explains what each one is actually good for.

Disclosure: We make ScheduleChat, so weigh our ranking accordingly. We've tried to be fair about the others. Every competitor detail below is taken from the vendor's own website, checked in November 2026. Prices change, so check before you buy.

How we compared them

Five questions matter when you choose an XER viewer:

  1. Display or recalculate? Most viewers show the dates and float P6 stored at its last scheduling run. Some tools run their own calculation, which lets you test changes but can differ from P6.
  2. Can you follow the logic? Trace logic and critical-path views are what separate a schedule review from scrolling.
  3. Quality checks? Some tools score the schedule against best-practice checks such as DCMA 14-point.
  4. Platform. Windows only, Mac, or browser.
  5. Price. From free to the cost of a P6 seat.

The ranking

1. ScheduleChat: best for asking questions of a schedule

What it is: a web app that pairs a chat assistant with its own critical-path (CPM) engine. You import a P6 XER, MS Project XML or .mpp file and ask questions in plain language.

What it does well: it answers the questions people actually open an XER to ask. What's driving the finish? How much float does this activity have? What depends on it? Are we late against baseline? What if this slips two weeks? Dates and float are computed by the engine from the imported activities and links. The assistant chooses the calculation and explains it. It does not invent numbers. What-ifs are simulated without changing the saved schedule. A health check flags activities with no links, circular logic, missing durations, links on summary tasks, overdue work and excessive float. You can export to XER or MS Project XML.

Limits, plainly: it isn't a P6-style viewer. It reads activities, WBS, logic and the working calendar, but not resources, costs or activity codes. It doesn't reproduce P6 layouts or produce a DCMA report. Because it recalculates, check its finish date against the file's own before relying on it, especially on multi-calendar schedules.

Platform and price: browser. Free plan with limits on projects, schedule size, daily messages and some formats. Paid Pro plan for bigger schedules.

Best for: project managers, owner's reps, site leads and anyone who needs answers rather than layouts.

2. ScheduleReader (Synami): best P6-style read-only viewer

What it is: a standalone viewer for XER and P6 XML files. It was previously known as PrimaveraReader and was first launched commercially in 2016.

What it does well: familiar, P6-like views. You get an interactive Gantt and activity table, trace logic and critical path, baseline comparisons, advanced filters and groups, and progress updates from the field. Files open read-only, so the original isn't modified. The PRO edition adds reports and dashboards, DCMA 14-point analysis, project comparison, and risk, calendar and linear views.

Platform and price: Windows, Mac and ScheduleReader Online in the browser. Standard from US$344/year, PRO US$440/year, with a 15-day trial. Team and enterprise licences are quoted.

Best for: teams that want P6's look and feel without P6.

3. Steelray Project Viewer: lowest-cost paid viewer for P6 and MS Project files

What it is: a long-standing viewer for Microsoft Project and Primavera files. Steelray says it introduced the first MS Project viewer in 2000.

What it does well: you open the file directly, with no import or upload, and see the core views and data. It has schedule search across tasks, resources and dates, one-click navigation, and better printing control than most. It opens Microsoft Project files and P6 XER files.

Platform and price: desktop installer. US$24.95 per user per year for the Primavera viewer or the Microsoft viewer. The Ultimate edition, covering both, is US$35 per user per year.

Best for: organisations that need many people to open schedules cheaply, especially when both P6 and MS Project files arrive.

4. Aurora-Viewer (Stottler Henke): best free desktop option

What it is: a free Windows viewer for XER files.

What it does well: more than you'd expect for free. It has Gantt, tabular and single-element views, critical path and total float read from the file, constraint and link-type display, and a project overview report. Recent versions add logic checks, a redundant-constraints finder, a partial DCMA report and critical-path drag analysis.

Platform and price: Windows, free. The installer is large (about 676 MB). The download offered at the time of writing is named as a build for 19 October to 31 December 2026 with 50 uses, so expect to fetch a newer one from time to time.

Best for: occasional reviewers on Windows who want logic checks without paying.

5. Eleco Project Viewer: free viewer for mixed Asta, P6 and MS Project files

What it is: Eleco's (Elecosoft's) free viewer, built mainly for sharing Asta Powerproject plans. It also opens other formats.

What it does well: view, navigate and print Asta Powerproject and Easyplan projects, plus Microsoft Project XML and Primavera XER files (P6, P5 and P3e 4.1). Download is free after a short form.

Platform and price: downloadable desktop viewer, free.

Best for: anyone who receives Powerproject plans as well as XERs.

6. Steelray Analyzer for P6 or Deltek Acumen Fuse: when you need a quality score, not a viewer

These aren't viewers, but they're often what the reviewer actually needs.

  • Steelray Analyzer for P6 runs schedule quality and performance checks, including DCMA DECM metrics and the 14-point assessment, on two or more updates of the same P6 schedule. It shows trends over time. US$990 per user per year.
  • Deltek Acumen Fuse evaluates schedules against more than 600 metrics drawn from DCMA, DOE, GAO, AACE and NASA standards. It works with P6, MS Project, Powerproject and others, and includes forensic comparison between versions with half-step delay analysis. Pricing isn't listed; Deltek offers demos.

Best for: project controls specialists, compliance reviews and claims work.

7. Primavera P6 Professional: when nothing else will do

If you need to edit the schedule, rerun it with the author's exact settings, or work inside a P6 database, use P6. Oracle's store lists P6 Professional at US$3,880 per application user (perpetual), plus US$853.60 for the first year of support. It includes its own Schedule Comparison tool for listing what changed between two versions. (Is that licence worth it just to read a schedule?)

Side by side

Tool Opens XER Recalculates Trace logic / critical path Quality checks Platform Price (Nov 2026)
ScheduleChat Yes (plus MS Project XML, .mpp) Yes, own CPM engine Asked in chat Structural health check Browser Free plan; Pro
ScheduleReader Yes (plus P6 XML) No (read-only) Yes DCMA 14 in PRO Windows, Mac, browser From US$344/yr
Steelray Project Viewer Yes (plus .mpp) No Navigation and search No Desktop US$24.95/yr; US$35 both
Aurora-Viewer Yes No (reads stored float) Yes Logic checks, partial DCMA Windows Free
Eleco Project Viewer Yes (plus MS Project XML, Asta) No Viewing No Download Free
Steelray Analyzer for P6 Yes n/a n/a DCMA, trends over updates Download (free trial) US$990/yr
Acumen Fuse Yes (plus others) n/a n/a 600+ metrics, forensic comparison See Deltek Not listed
P6 Professional Native Yes Yes Schedule Comparison On-premises install US$3,880 + support

A word on free browser viewers

Many free, browser-based XER viewers have appeared, often from consultancies and small tool makers. Some read the file entirely in your browser. Others upload it to a server. For a quick look at a non-sensitive file they can be handy. Before you drop a confidential programme into one, check the site's statement about whether the file leaves your computer.

Which one should you pick?

  • You need to understand the schedule quickly, or answer someone's question about it: ScheduleChat.
  • You need P6-like views for a team of reviewers: ScheduleReader.
  • You need lots of people to open files cheaply: Steelray Project Viewer.
  • You review now and then on Windows and don't want to pay: Aurora-Viewer.
  • You need a compliance or quality score: Steelray Analyzer for P6 or Acumen Fuse.
  • You need to edit: P6.

If your Friday-afternoon XER is waiting, open it in ScheduleChat and ask it what's driving the finish.

Related: best AI tools for construction scheduling in 2026.